UBC Home Page -
UBC Home Page -
UBC Home Page UBC Home Page -
-
-
News Events Directories Search UBC myUBC Login
-
- -
UBC Public Affairs
News
UBC Reports
UBC Reports Extras
Goal / Circulation / Deadlines
Letters to the Editor & Opinion Pieces / Feedback
Advertising
UBC Reports Archives
Media Releases
Services for Media
Services for the Community
Services for UBC Faculty & Staff
Find UBC Experts
Search Site
-

UBC Reports | Vol. 51 | No. 1 | Jan. 10, 2005

Timepiece 1925

Main Library Under Construction

By Chris Hives, University Archives

Designed by the architectural firm of Sharp & Thompson, the Library was one of the three original permanent buildings on the Point Grey campus. The Library's granite facing stones were quarried on Nelson Island in Pender Harbour and barged to the foot of the Point Grey cliffs. From there they were hauled to the building site using an aerial tramway and light railway system. Two wings (1948, 1960) were added to the original structure.

Currently the site of extensive construction and renovation activity, the Main Library is being transformed into the Irving K. Barber Learning Centre. The project will result in the removal of the building’s two additions and a new structure will wrap around three sides of the original Library building.

Opening of the new Barber Learning Centre is scheduled for late 2006.

- - -

 

-

Last reviewed 22-Sep-2006

to top | UBC.ca » UBC Public Affairs

UBC Public Affairs
310 - 6251 Cecil Green Park Road, Vancouver, BC Canada V6T 1Z1
tel 604.822.3131 | fax 604.822.2684 | e-mail public.affairs@ubc.ca

© Copyright The University of British Columbia, all rights reserved.